Skip to content

Welcome to

XaiR logo

Select and engineer
custom HVAC equipmentAll from one platform

XaiR is the most innovative and flexible application in the industry for transforming customer requirements into fully realized custom HVAC equipment, backed by engineering validation.

Request a demo

Supported Selections

Currently supporting air handling units, coils, and chillers. Custom selections and product lines can be implemented per manufacturer.

XaiR CDE specification comparison overview with review status counts
1/2

AI-Powered Workflows

Go beyond a chat interface. XaiR leverages AI to assist with complex workflows.

  • Import PDFs, Word documents, emails, and multi-unit schedules
  • Automatically extract equipment requirements
  • Generate preliminary configurations
  • Create reports for compliance, deviations, and exceptions, saving hours of manual work
XaiR custom HVAC equipment project dashboard with lifecycle status tracking

Project Lifecycle Dashboard

Manage and track every stage of the process from quoting to manufacturing release in one connected project record.

  • Cloud-based project visibility with real-time status from early bid through manufacturing release
  • Revision history tracking
  • Available to use on mobile, tablet, and desktop devices
  • One connected record that reduces disconnected file handoffs between sales, engineering, and production

Significant lead time reduction

20 Hours Per Project
Estimated Average Sales Time Reduction
60 Hours Per Unit
Estimated Average Engineering Time Reduction

Built for professionals who sell, engineer, and manufacture HVAC equipment

Sales Teams

Configure non-standard layouts, price projects, and prepare customer-ready deliverables in the same platform.

Engineering Teams

Review AI-extracted compliance reports and validate unit performance with built-in engineering calculations.

Manufacturing Teams

Automate CAD models, coordinate conduit outputs, schematics, and nameplates from the approved configuration.

Want to see XaiR in action?

Request a demo for your team

Tell us about your process. We will show you how XaiR can improve the workflow.